Skip to content Skip to sidebar Skip to footer

Calculate The Work Done On A 1500 Kg Elevator Car

Calculate The Work Done On A 1500 Kg Elevator Car. (b) what is the work done on the lift by the. (a) find the work done by the.

SOLVEDDoes the work done in lifting an object de…
SOLVEDDoes the work done in lifting an object de… from www.numerade.com

Increase in potential energy of elevator =mgh=1500 × 9.8 × 40=588 kj. (b) what is the work done on the lift by the. (b) what is the work done on the elevator car.

Lift It 40.0 M At Constant Speed, Assuming Friction Averages 100 N.


(a) calculate the work done on a. Calculate the work done on a 1500 kg elevator car by its cable to lift it 40.0 m at constant speed, assuming friction averages 100 n. (b) what is the work done on the lift by.

Ncert Solutions For Class 12.


Energy principle which states that the work done is equal to the change in energy. (a) calculate the work done on a 1500 kg elevator car by its cable to lift it 40 m at constant speed, assuming friction force averages 100 n. The cable has to work against gravitational force and friction force.

For This Problem, We Will Have To Use It To Work.


Using the data in the graph calculate the total distance covered by the car. It then travels along a straight road such that its distance from the light is given by x (t) = b t 2 − c t 3 , where b = 2.40 m s 2 and c = 0.120 m s 3. (b) what is the work done on the lift by the.

(B) What Is The Work Done On.


A car of mass 1000 kg is moving with a velocity of 10 m/s. (b) what is the work done on the elevator car. (b) what is the work done on.

A Cable Exerts A Constant Upward Tension Of Magnitude 1.54 10 4 N On A 1.20 10 3 Kg Elevator As It Rises Through A Vertical Distance Of 4.50 M.


Therefore, the work done on the mass is,. Calculate the work required to be done to stop a car of 1500 kg moving at a velocity of 60 km/h? (a) 1250 m (b) 875 m (c) 1500 m (d) 870 m.

Post a Comment for "Calculate The Work Done On A 1500 Kg Elevator Car"